Skip to main content

Planning proposals

Approved

Liverpool Local Environmental Plan (Draft Amendment No. 25) Proposed Rezoning Of New Brighton Golf Course

Liverpool

To rezone a 16.75ha portion of the 87.5ha New Brighton Golf Course (NBGC) land at Moorebank to permit residential development of 310 dwellings and the continued operation of the golf course (via expansion to the south), together with the environmental and open space enhancement of the Georges River foreshore lands. The location and aerial map of the site is at Tags 1 and 2, and the existing zoning the proposed indicative rezonings are shown at Tags 3 and 4, in the "documents" section of the planning report. Specifically the proposal involves: Area A (refer to the proposed indicative rezoning map at Tag 4) - Rezoning the western portion of the New Brighton Golf Club site from RE2 Private Recreation to R2 Low Density Residential while also adding an additional use into Schedule 1 Additional Permitted Uses for "Multi Dwelling Housing"; Area B (refer to the proposed indicative rezoning map at Tag 4) - Rezoning of a section of foreshore land of 40 metres wide (including a 5 metre wide strip of land connecting the foreshore land to existing Council owned land) from RE2 Private Recreation to RE1 - Public Recreation, and the reclassification of the land from operational to community; Area C (refer to the proposed indicative rezoning map at Tag 4) - Rezoning of part of the land on the southern side of the M5 Motorway, Hammondville from RE1 Public Recreation to RE2 Private Recreation, and the reclassification of the land from community to operational; Area D (refer to the proposed indicative rezoning map at Tag 4) - Rezoning of a portion of land south of the M5 Motorway from RE2 - Private Recreation to RE1 Public Recreation to assist in strengthening core support habitat community and the reclassification of the land from operational to community; Area E (refer to the proposed indicative rezoning at Tag 4) - Rezoning of a portion of land north of the M5 Motorway from RE2 - Private Recreation to E2 Environmental Conservation to assist in strengthening core support habitat community.Council's planning proposal is at Tag 5.

Documents (41)

Draft Planning Proposal
Tag_5_-_Liverpool_Planning_Proposal.pdf
Draft Planning Proposal
Tag_9_-_Land_Use_Table_for_R1_Zone.pdf
Draft Planning Proposal
Tag_11_-_Land_Use_Table_for_R3_Zone.pdf
Draft Planning Proposal
Tag_10_-_Land_Use_Table_for_R2_Zone.pdf
Final Assessment Report
SRW Gateway Extensions.pdf
Final Assessment Report
5.01 Liverpool Gateway.pdf
Final Assessment Report
5.02 Liverpool PR Report.pdf
Final Assessment Report
5.01 Liverpool Planning Team Report.pdf
Final Planning Proposal document
Tag_5_-_Liverpool_Planning_Proposal.pdf
Final Planning Proposal document
Tag_9_-_Land_Use_Table_for_R1_Zone.pdf
Final Planning Proposal document
Tag_11_-_Land_Use_Table_for_R3_Zone.pdf
Final Planning Proposal document
Tag_10_-_Land_Use_Table_for_R2_Zone.pdf
Gateway determination report
SRW Gateway Extensions.pdf
Gateway determination report
5.01 Liverpool Gateway.pdf
Gateway determination report
5.02 Liverpool PR Report.pdf
Gateway determination report
5.01 Liverpool Planning Team Report.pdf
Map of the applicable land area
Tag_1_-_Location_map.pdf
Map of the applicable land area
Tag_2_-_Aerial_photo.pdf
Map of the applicable land area
Tag_3_-_Existing_Zoning.pdf
Map of the applicable land area
Tag_4_-_Proposed_indicative_zoning_map.pdf
Map of the applicable land area
Tag_6_-_Acid_sulfate_soils_map.pdf
Map of the applicable land area
Tag_7_-_Flood_planning_area_map.pdf
Map of the applicable land area
Tag_8_-_Council's_Bushfire_Prone_map.pdf
Other
2_Contamination_Assessment_GHD_Appendix_A_Figures.pdf
Other
3_Contamination_Assessment_GHD_Appendix_B.pdf
Other
1_Transport_Assessment_GHD_Chapters_1_to_3_June_2011.pdf
Other
2_Transport _Assessment_GHD_Chapters_4_to_6_June_2011.pdf
Other
Acoustic_ Report_GHD_June_2011.pdf
Other
Assessment_of_significance_threatened_flora_species_populations+
Other
Flood_and_Water_Sensitive_Urban_Design_Report_GHD_June_2011.pdf
Other
Preliminary_Bushfire_Constraints_Advice_ABPP_30_March_2011.pdf
Other
Summary_of_the_flora_assessment_Anne_Clements_25_May_2011.pdf
Other
CProposal Cover letter.pdf
Other
1_Contamination_Assessment_GHD_Main_Report.pdf
Planning Proposal maps
Tag_1_-_Location_map.pdf
Planning Proposal maps
Tag_2_-_Aerial_photo.pdf
Planning Proposal maps
Tag_3_-_Existing_Zoning.pdf
Planning Proposal maps
Tag_4_-_Proposed_indicative_zoning_map.pdf
Planning Proposal maps
Tag_6_-_Acid_sulfate_soils_map.pdf
Planning Proposal maps
Tag_7_-_Flood_planning_area_map.pdf
Planning Proposal maps
Tag_8_-_Council's_Bushfire_Prone_map.pdf

Activity Details

Number
PP-2020-1686
Stage
Approved
Address
Nuwarra Rd/ M5 Motorway Liverpool Moorebank
Date Review Commenced
Link to PPA Website
Date of Publication
Publish Decision
No
Link to LEP Document

Department Contact
Name
Michelle Dellagiacoma
Council Contact Detail
Name
Murray Wilson