Complaints
Want to lodge a compliance complaint about this project?
Make a Complaint
Enforcements
Prosecution of Leda Manorstead Pty Ltd (MP08_0200 as modified, Tweed Shire LGA)
On 26 March 2021, Leda Manorstead was convicted and fined $170.000 in the Land and Environment Court for non-compliance with MP08_0200 as modified (the consent), relating to exceedances of the maximum allowable exposed bulk earthworks and working outside of approved areas at the Cobaki Residential Development. The below link provides further details.
https://www.planning.nsw.gov.au/News/2021/Leda-to-pay-170000-in-fines-for-non-compliance
Inspections
19/09/2023
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.