State Significant Development

Response to Submissions

Calala Battery Energy Storage System

Tamworth Regional

Current Status: Response to Submissions

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Development of a 300 MW / 1200 MWh battery storage system and associated infrastructure including grid connection.

Attachments & Resources

Notice of Exhibition (1)

Request for SEARs (11)

SEARs (1)

EIS (36)

Response to Submissions (1)

Agency Advice (25)

Submissions

Filters
Showing 21 - 27 of 27 submissions
Name Withheld
Object
GULGONG , New South Wales
Message
I object to this Electricity Generating Works proposal because I cannot support a project that relies on slave labour to provide its tonnes of large-scale toxic batteries.

Despite decades of rolling out wind and solar plants in many countries the CO2 emissions still rise every year. Wind and solar projects, including this proposed stand alone BESS project, just make no difference. This BESS will increase atmospheric CO2 and increase our NEM electricity system costs to me and other end consumers. I object to any project that costs me heaps for no benefit at all. Don't approve this useless project!
Name Withheld
Object
GULGONG , New South Wales
Message
My oppositions to this proposed project are many but in particular I am very concerned about the use of industrial lithium batteries. They require many minerals to be mined, including in wilderness areas, that are toxic and, in some cases, require the use of slave labour to keep costs down. The recycling of thousands of Tonnes of lithium batteries is not yet viable and, due to their short economic lives, will pollute our environments in a few short years. They pose fire and toxic smoke risks to fire-fighters and nearby residents and towns that will continue to occur despite the claims by the Proponent.
Save Our Surroundings (SOS)
Object
Gulgong , New South Wales
Message
Save Our Surroundings (SOS) objects to proposed BESS Works in this project because there are still so many unresolved concerns about risks and issues involved with Battery Energy Storage Systems (BESS), for instance:
1. Lack of research into the life-cycle of BESS
2. Resource intensive requirements
3. Involves slavery in mining and production
4. Environmentally damaging
5. Fire starting risks increased
6. Fire-fighting dangers increased
7. Local fire risks considerably increased
8. Expensive
9. Short life-span
10. Variable operation
11. Very little Australian content
12. Increased energy and sovereign risks
13. Roads and road travel are impacted
14. Electricity charging and air-conditioning requirements are high
15. Classed as hazardous goods
16. No certainty at end of the short life of a BESS
17. Increased dependency on intermittent electricity generation
18. Poor viability
19. Increase retail electricity prices.

Please refer to the attachment for details.
Attachments
Ian McDonald
Object
WALCHA , New South Wales
Message
Please see attachment
Attachments
John Sissons
Object
CALALA , New South Wales
Message
We object to the project and attach our submission
Attachments
Name Withheld
Object
MOLLYAN , New South Wales
Message
I object because these projects are too damaging to the communities, landscapes, environment and animals. what happens when they catch fire? Not only are they dangerous, they are an absolute eye-sore. Let's put these in Canberra or closer to the cities; so all the NIMBYs can marvel at what their vote has given them. Leave our landscapes alone and our government needs to do better.
Name Withheld
Object
MOLLYAN , New South Wales
Message
i object to this project as renewable energy is too unreliable and not a solution to power NSW/Australia. More research needs to take place to find a better solution. BESS is too toxic to the environment, humans and animals.

Pagination

Project Details

Application Number
SSD-52786213
Assessment Type
State Significant Development
Development Type
Electricity supply
Local Government Areas
Tamworth Regional

Contact Planner

Name