Modifications to existing drainage infrastructure DA 23/12346

Randwick

Modifications to existing drainage infrastructure within the Port Botany lease area including:
• removal of five (5) existing stormwater pits and reconstruction of five (5) culvert riser pits; and
• construction of six (6) additional stormwater pits.

Development Address: 9 Bumborah Point Road, Matraville 2036 (Lot 21 DP1068292)

Application Documents (13)

Arborists report
Appendix 7_Arboricultural Assessment Report
Architectural Plans
Appendix 2_Drainage Layout Plan
Assessment report
DA23-12346 9 Bumborah Point Road Matraville - Assessment Report
Flood risk management report
Appendix 9_Flooding Report
Other
DA23-12346 9 Bumborah Point Road Matraville RFI Letter_20231103
Other
DA23-12346 9 Bumborah Point Road Matraville RFI Letter_20231017
Other
DA23-12346 9 Bumborah Point Road Matraville - RFI Letter_20231013
Other
Appendix 6_Site Management Plan
Other
Appendix 10_Construction Methodology
Site plans
Appendix 3_Overall Site Plan -
Site plans
Appendix 5_Sheet Level Plan
Statement of environmental effects
WTJ23-221_Statement of Environmental Effects
Stormwater drainage plan
Appendix 1_Drainage Design Report

Determination Documents (5)

Agency advice
EPA advice drainage easement
Contamination and/or remediation action plan
Appendix 8_Site Contamination Management Plan
DA Stamped plans
DA 23-12346 Stamped Plans
Notice of determination
Development Consent DA 23-12346 9 Bumborah Point Road Matraville
Section 10.7 Planning Certificate (formerly Section 149)
Appendix 4_Section 10.7 Planning Certificate

Project Details

Portal reference number
PAN-366762
Consent authority's ID number
DA 23/12346
Property Address
29 9 Bumborah Point Road Matraville 2036
Lot/DP number
21/-/DP1068292
Type of application
Development Application
Type of development
Flood mitigation work, Port, wharf, boating facilities
Description of the development
Removal of five (5) existing stormwater pits and reconstruction of five (5) culvert riser pits; and
Construction of 6 new stormwater pits
Exhibition start - end date
-
Determining authority
Minister for Planning and Public Spaces
Decision
Approved
Determination date

Consent Authority

Consent authority name
Minister for Planning and Public Spaces / Independent Planning Commission