Skip to main content

State Significant Development

Determination

Westmead Catholic Community Education Campus

City of Parramatta

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Primary school with capacity for approximately 1,680 students, new Parish church, early learning centre, tree removal and landscaping.

Archive

Notice of Exhibition (1)

Notice of Exhibition_10092021_120007

Request for SEARs (4)

SEARs Request - Appendix A - Cost Estimate
SEARs Request - Appendix B - Preliminary Plans
SEARs Request - Appendix C - Biodiversity Assessment Waiver Request
SEARs Request - Report

SEARs (2)

Issued SEARs_22112019_034227
Issued SEARs_09012020_093342

EIS (37)

Environmental Impact Statement
B_Architectural Plans (Part 1 - Site)
B_Architectural Plans (Part 2 - Church)
B_Architectural Plans (Part 3 - K-6 Building)
B_Architectural Plans (Part 4 - Catholic ELC)
C_Architectural Design Statement
D_SEARs
E_Survey Plan
F_Flora and Fauna Assessment
G_Transport Assessment & Green Travel Plan
H_Landscape Plans
I_Arboricultural Impact Assessment
J_Infrastructure and Services Report
K_Construction Management Plan
L_Community Engagement Report
M_Noise & Vibration Impact Assessment
N_ACHAR
O_Preliminary Site Investigation
P_ESD Report
Q_Statement of Heritage Impact
R_Water Management Plan
S_Civil Plans
T_Geotechnical & Hydrogeological Assessment
Z_BCA Compliance Statement
AA_Qualitative Wind Assessment
BB_Fire Engineering Statement
DD_Access Review
GG_Section 10.7 Certificate
FF_Social Impact Assessment
Y_Operational WMP - Education Works
X_Operational WMP - Parish
V_BDAR Waiver
W_Aeronautical Impact Assessment
CC_Structural Report
U_Flood Statement
EE_HAZMAT Reports
Application_20200327064043

Response to Submissions (22)

Request RTS_28092021_071242
Request RTS letter
218316_WCC_RTS Report_14Sept2020
Appendix A_Detailed Response Table_14Sept20
Appendix B_Revised Drawings, Shadows and Diagrams
Appendix C_Traffic and Transport Response
Appendix D_Framework Travel Plan
Appendix E_Research Summary
Appendix F_Revised Land. Plans and Statement
Appendix G_Revised Noise and Vibration Assessment
Appendix H_Revised Qualitative Wind Assessment
Appendix I_Photomontages_lowres
Appendix K_Stormwater Engineering Statement
Appendix L_Revised HIS and Archaeology
Appendix M_Arborist Report
Appendix N_Council Meeting Minutes
Appendix O_Solar and Access to Daylight Analysis
Appendix P_Landscape Rehab Plan and VMP
Appendix Q_HAZMAT Letter
Appendix R_Indicative Schedule of Community Uses
Request RTS_07052020_103745
218316_WCC_Response to Submissions_14Oct2021

Agency Advice (11)

RTS HC SSD 10383_signed 20092021
TfNSW Response SSD-10383
Sydney trains comments
EES response - Supplementary RtS (SSD 10383)
Endeavour Energy
Westmead Catholic Community Education Campus
Cumberland Council Response
Water NSW comments
HNSW comments
Comments - water group
CASA comments

Amendments (14)

Attachment A_Transport report
Attachment D_Revised Civil Drawings and Report
Attachment B_Architectural Statement_Part2
Attachment B_Architectural Statement_Part1
Attachment C_Land Drawings and Design Statement
Attachment B1_Architectural Plans (Site)
Attachment B3_Architectural Plans (K-6 Building)
Attachment B2_Architectural Plans (Parish Church)
Attachment B4_Architectural Plans (CELC)
Attachment B_Architectural Statement_Part3
Attachment F_SIDRA Model Calibration and Val
Attachment E_Open Space Response Table
Attachment B5_Architectural Plans (Car Park)
218316_WCC RFI Response and Amendments_6Sep21

Additional Information (15)

RFI Request - Open Space
RFI Request for Additional Information_19052021_104015
RFI Request for Additional Information_25032021_024219
RFI Request for Additional Information_04032021_071352
RFI Request for Additional Information_24112020_012329
RFI Request for Additional Information_17092020_043914
218316_WCC_Traffic Peer Review RFI_23Dec2020
218316_WCC_RFI Response_8Feb2021
WCC Response to RFI_10March2021
Attachment B_Marist Strategy Submission
Attachment A_CEDP_Westmead Strategy Submission
Attachment C_Oval Access Schedule
218316_WCC_RFI Response_1April2021
218316_WCC_RFI Traffic and Open Space_7Sep21
218316_WCC_Additional Information_26Nov2021

Recommendation (4)

Appendix D - Bitzios Peer review
Appendix F - Recommended Instrument of Approval
Assessment Report SSD-10383
Appendix E - Bitzios Independent Analysis

Determination (5)

Statement of Reasons
Conditions of consent
Approved Plans part 1
Approved plans Part 2
Approved Landscape Plans Part 3

Approved Documents

There are no post approval documents available

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

There are no inspections for this project.

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 1 - 20 of 20 submissions
WaterNSW
Comment
PARRAMATTA , New South Wales
Message
Thank you for requesting WaterNSW's comments on the EIS for the above project. Please note that the subject site is not located near any WaterNSW land, assets or infrastructure, and therefore we have no comments or particular requirements.
ENVIRONMENT PROTECTION AUTHORITY
Comment
,
Message
EPA Response - No Interest Letter
Attachments
Cumberland Council
Comment
,
Message
No Comments as this application does not fall under Cumberland LGA
Stephan Narayan
Support
WESTMEAD , New South Wales
Message
I support the building of the catholic precinct.
Biodiversity and Conservation Division
Comment
PARRAMATTA , New South Wales
Message
Please find attached EES comments
Attachments
HERITAGE COUNCIL OF NSW
Comment
PARRAMATTA , New South Wales
Message
Heritage NSW advice on EIS
Attachments
City of Parramatta Council
Object
PARRAMATTA , New South Wales
Message
Dear Prity,

Please find attached Council's Submission (Objection) for SSD 10383 - Westmead Catholic Community Education Campus.

Attached to this submission are the following documents:
- Council submission - SSD 10383
- Attachment One - Design Principles - SSD 10383
- Attachment Two - Councillors Comments - SSD 10383

Should you have any questions please do not hesitate to contact myself as per the details below or Myfanwy McNally at [email protected] or 9806 5447.

Regards,

Thomas Fernandez
[email protected]
9806 5571
Attachments
ROADS AND MARITIME SERVICES DIVISION
Comment
PARRAMATTA , New South Wales
Message
See attached.
Attachments
CASA
Comment
PHILLIP , Australian Capital Territory
Message
Attachments
NSW Ambulance
Comment
Bankstown Airpor , New South Wales
Message
Attachments
Sydney Trains
Comment
Burwood , New South Wales
Message
Attachments
Department of Planning, Industry and Environment
Comment
Newcastle , New South Wales
Message
See attached
Attachments
Air Services
Comment
Melbourne Airpor , Victoria
Message
See attached
Attachments
DPIE - Water and the Natural Resources Access Regulator
Comment
Parramatta , New South Wales
Message
See attached
Attachments
Sydney Water
Comment
PARRAMATTA , New South Wales
Message
See attached.
Attachments
Anita Zoglmeyer
Comment
WESTMEAD , New South Wales
Message
As a resident of a Maple Tree Rd Unit Westmead , although not objecting to the creation of pedestrian access from school to Farmhouse Rd I have concerns that this will lead to increased parents- car drop-off and pick-up of children in our access to our residential car park. Currently I have experienced delays being able to enter with my car or exit during pre & post school times, which already causes inconvenience. How does the school propose to manage this current and future problem. Will they provide a school turning circle on their grounds? Also have noticed increased rubbish being dropped by students as evidenced by school related notes and paraphernalia. Can the school provide bins at the school exit to mitigate this problem.
Richard Zoglmeyer
Comment
WESTMEAD , New South Wales
Message
SSD – 10383
Dear Sir/Madam,
Thank you for the opportunity to provide comment on the advertised development.
As a resident on Maple Tree Rd which is presently being used as student and staff access from Farmhouse Rd to the eastern entry and exit side gate of the school.
I wish to lodge three requests associated with the fourth amendment of the development application. Due to the present and future high pedestrian access route to the school site these are matters that have impacted on the immediate neighbourhood.
If the side gate access to Maple Tree Rd continuing onto Farmhouse Rd is still in the plan
1. That there be a permanent rubbish bin located at the school gate side for students to deposit their litter as they leave and arrive, this can emptied by school grounds staff. I personally do a weekly rubbish pick up in this vicinity and frequently find rubbish dropped on the pathway, gardens and drain grates. I have also found school information sheets and notes to parents relating to individual students.
2. Our one way resident access road (Maple Tree Rd) has become a defacto student drop off and pick up on the road and many a time directly on the pedestrian crossing, without any proper kerbside parking.
This I believe is illegal and an unsafe driver practice.
I note that Transport NSW has stated that
• Information has not been provided on how/if school access points and school zones will be impacted as part of the new proposal and how drop off/students will be managed moving forward.
In the afternoons the parents who have arranged to pick up their child at this pedestrian crossing will arrive half an hour earlier and stop their cars on the circular road outside the Highline Apartments until a resident comes home and needs to drive into the underground carpark, whereby the ‘conga line’ of waiting cars have to be asked to move. Where sometimes tempers become flared. This is also a problem when residents need to drive out of the apartments where they are then forced into this queue of waiting cars. Police presence to target this illegal practice might assist with resolving this school related problem.
Has the development application provided safe and ample drop off zones such as ‘kiss and drive’ for the projected numbers of students that need to be driven to the Catholic Community Campus? The name in itself acknowledges that it is and will be accommodating a large population of students requiring to be driven from other suburbs.

3. There is also a safety concern relating to groups of students walking diagonally across the road (Maple Tree Rd) into the garden island from the heritage WSU building rather then following the designated path and pedestrian crossing. To reduce this practice can only be explained at student assemblies and reinforced by executive teaching staff observing student arrival and departure at random times of each school term.
Thank you
Name Withheld
Comment
WESTMEAD , New South Wales
Message
Related to Creation of a pedestrian access from farmhouse road -
Our main concern regarding the amendment is the added congestion to our main road (maple tree road) and the 2 connecting roads (farmhouse/darcy road) that this project may create. Currently pre-covid, it has already been extremely difficult for residents to drive in and out within the vicinity during school pickup and drop off hours.
City of Parramatta Council
Comment
Parramatta , New South Wales
Message
Attachments

Pagination

Project Details

Application Number
SSD-10383
Assessment Type
State Significant Development
Development Type
Educational establishments
Local Government Areas
City of Parramatta
Decision
Approved
Determination Date
Decider
IPC-N

Contact Planner

Name
Aditi Coomar