State Significant Development
Determination
Sebastopol Solar Farm
Junee Shire, Temora Shire
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Development of a 90 MW solar farm with energy storage and associated infrastructure.
Modifications
Determination
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
There are no enforcements for this project.
Inspections
18/6/2021
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.
Submissions
Showing 1 - 13 of 13 submissions
Junee Shire Council
Comment
Junee Shire Council
Comment
JUNEE
,
New South Wales
Message
Junee Shire Council requires the following in relation to the Sebastopol
Solar Farm:
Eurolee Road is to be sealed for a length of 400m from Goldfields way:
Shape Existing Pavement Subgrade and install Drainage as needed.
Pavement base 150mm of DGB 20 at 8m wide.
14/7 Two coat Seal at 7m wide.
A section 138 application will be required to be submitted and an
inspection carried out by Councils Staff on the project.
Cole Davis
Director of Engineering Services
Solar Farm:
Eurolee Road is to be sealed for a length of 400m from Goldfields way:
Shape Existing Pavement Subgrade and install Drainage as needed.
Pavement base 150mm of DGB 20 at 8m wide.
14/7 Two coat Seal at 7m wide.
A section 138 application will be required to be submitted and an
inspection carried out by Councils Staff on the project.
Cole Davis
Director of Engineering Services
Temora Shire Council
Comment
Temora Shire Council
Comment
Temora
,
New South Wales
Message
Temora Shire Council considers that the following chapters of the Temora
Development Control Plan 2012 are relevant to the application and
should be considered: engineering standards, environmentally sensitive
areas, erosion and sediment control, industrial development,
landscaping and rural development. We also highlight that Council has
a Section 94A Developer Contributions Plan in place. Although Council
is not realistically expecting a contribution based upon the 1% value
of the development, a contribution based upon the civil works involved
with the project, under a planning agreement is reasonable, given the
anticipated additional demands on Council resources as a result of the
construction and future operation of this project.
Development Control Plan 2012 are relevant to the application and
should be considered: engineering standards, environmentally sensitive
areas, erosion and sediment control, industrial development,
landscaping and rural development. We also highlight that Council has
a Section 94A Developer Contributions Plan in place. Although Council
is not realistically expecting a contribution based upon the 1% value
of the development, a contribution based upon the civil works involved
with the project, under a planning agreement is reasonable, given the
anticipated additional demands on Council resources as a result of the
construction and future operation of this project.
Environmental Protection Authority
Comment
Environmental Protection Authority
Comment
Fire & Rescue NSW
Comment
Fire & Rescue NSW
Comment
NSW Rural Fire Service
Comment
NSW Rural Fire Service
Comment
TransGrid
Comment
TransGrid
Comment
Local Land Services NSW
Comment
Local Land Services NSW
Comment
The Department of Planning & Environment - Division of Resources & Geoscience
Comment
The Department of Planning & Environment - Division of Resources & Geoscience
Comment
Hunter Region Mail Centre
,
New South Wales
Message
See Attached.
Attachments
Roads and Maritime Services
Comment
Roads and Maritime Services
Comment
Office of Environment & Heritage
Comment
Office of Environment & Heritage
Comment
Heritage Council
Comment
Heritage Council
Comment
Parramatta
,
New South Wales
Message
See Attached.
Attachments
Department of Industry
Comment
Department of Industry
Comment
Essential Energy
Comment
Essential Energy
Comment
Pagination
Project Details
Application Number
SSD-9098
Assessment Type
State Significant Development
Local Government Areas
Junee Shire, Temora Shire
Decision
Approved
Determination Date
Decider
Last Modified By
SSD-9098-Mod-1
Last Modified On
03/07/2020