Skip to main content

Part4

Determination

Mt Pleasant Coal

Muswellbrook Shire

Current Status: Determination

Consolidated Consent

Consolidated Consent MOD 5

Modifications

Determination
Determination

Archive

Determination (1)

mc_condit.pdf

Approved Documents

Management Plans and Strategies (22)

Approval of Plan Strategy or Study_14042020_051745
Mount Pleasant Operation - Blast Management Plan
Environmental Management Strategy
Environmental Management Strategy
SWB Approval
GWMP Approval
SGWRP Approval
Approval of Plan Strategy or Study_15032021_050605
MPO - Out of Hours Work Protocol V3
Site Water Balance (Appendix 1)
Surface and Groundwater Response Plan (Appendix 5)
Groundwater Management Plan (Appendix 4)
Other_17062021_013506
Approval of Surface Water Man
Surface Water Management Plan
Approval of Plan Strategy or Study_21122021_105748
Approval Letter_Erosion and Sediment Control Plan
Noise Management Plan
Approval of Plan Strategy or Study_24022022_011440
Erosion and Sediment Control Plan
Approval Letter_Water Management Plan
Water Management Plan

Reports (3)

2019 Annual Review
2021 Annual Review & Rehab Report
2020 Annual Review

Independent Reviews and Audits (2)

2020 IEA MACH Energy RAR
Mount Pleasant Operation IEA - June 2020 SLR

Other Documents (6)

Other_23032022_101044
Other_24032022_064741
Other_22062020_094107
Approval of Plan Strategy or Study_05082020_074611
Letter - Flood Impact Assessement MOD 4
Mine Subsidence Assessment Report

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

28/06/2022

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Project Details

Application Number
DA92/97
Assessment Type
Part4
Development Type
Coal Mining
Local Government Areas
Muswellbrook Shire
Decision
Approve
Determination Date
Last Modified By
DA92/97-Mod-5
Last Modified On
29/06/2022