Marist Catholic College North Shore

North Sydney

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Demolition of existing buildings and construction of new 5 storey building to accommodate teaching facilities, early learning centre and auditorium. Adaptive reuse of the existing Presbytery.

Attachments & Resources

Notice of Exhibition (2)

Response to Submissions (36)

Agency Advice (4)

Additional Information (6)

Determination (5)

Approved Documents

Management Plans and Strategies (2)

Independent Reviews and Audits (2)

Other Documents (1)

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

29/09/2023

19/10/2023

24/11/2023

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 21 - 40 of 52 submissions
Name Withheld
Object
CROWS NEST , New South Wales
Message
Key issues of concern:
1. The EIS does not address all the SEARs. There is no information on the traffic impacts of the car park access and egress onto Carlow Street on the local roads, for example:
- there is no assessemnt of these vehicular movements at the intersection of Carlow and West Streets
- There is no reference to the Tucker Street/Carlow Street intersection
- will the Carlow Street car park egress requires any restrictions such as left in, left out.
- There is no assessment of the impact of the exiting vehicles on the functionality of the Carlow/Miller Street traffic signals and queuing of vehicles travelling in an easterly direction.
2. Interactions with surrounding land uses - the EIS does not identify the childcare centre at St Leonards Park and the numbers of pedestrians and children using the southern footpath on Carlow Street to access the traffic signal crossing of Miller Street. The EIS also does not identify other users and uses at St Leonards Park such as location recreation and special events.
3. Pedestrian safety and footpath widhts - the increase in numbers of students will place pressure on footpath widths on Carlow Street and Miller Street, particularly near the intersection of Carlow and Miller Street. The Miller Street footpath near the intersection can have crowing and restricted movement due to the bus stop for northbound buses, combined with parents with strollers. Carlow Street footpath needs to be wide enough to allow 2 wheelcahirs to pass each other, and two strollers to pass each other.
3. Parking provision is too high. Providing high levels (above DCP requirements) of parking leads to increased traffic generation. The EIS identifies parking is provided for St Marys and parish uses, however, this is also available for staff parking. The location of this facility, a block away from the new Sydney Metro station entrance allows for minimal parking to be provided on site. The mode share target(p94) states that there will only be a small shift to public transport, and hence the large number of parking spaces is required. This is not consistent with approaches to parking provision on a site which is in such close proximity to a turn up and go metro rail service.
4. Bulk and height of development on Carlow and Miller Street is too great. It does not relate to existing built form. For example:
- the streetscape studies (p84) link the building height to the height of the church - the top of the church being used to justify the height of the new building, is the top of the cross that is attached to the top of the church. The streetscape study should be using the height of the roof structure of the church.
- The streetscape study refers to the stanton library building. The library building is set a long way back from Miller Street and has an articulated facade. It is not a high building located on Miller Street, so it is not a reasonable streetscape comparison
- The building does not respond to North Sydney Hotel. This is a significant feature in the locality and its prominence will be lost due to the overpowering scale of the building at the corner of Carlow and Miller St. The southern end of the building has been designed to step down to the Presbytery, but there is no similar treatment for the North Sydney Hotel.
the building does not respond to the buidlings at north Sydney oval. These budlings have been set back from the kerb line with plantings to soften the scale. As well, the scale of these buildings is significantly lower than the proposed Marist buildings. If built to the current proposed form, the new Marist building on the corner of Miller and Carlow will dominate the streetscape.
- the building on the corner of Carlow and Miller Street does not relate to the streetscape of Carlow Street. It dominates the Marist Brothers residences on Carlow Street, which although part of the site area, have been designed as, and are used as residential huses. The proposed new building is over twice the height of these houses and has no relationship to them.
5. Management of peolpe flows at the pedestrian building entrance on Carlow Street - this needs to be re-designed to avoid conflict with other pedestrian users of the footpath. There is insufficient space to manage the large student numbers and crowding around the entrance, assocaited with it being a meeting point. The redesign needs to ensure free movement for pedestrians walking past the school to access or leave the park and the bus stop.
6. the traffic modelling needs reassessment. It states that the traffic numbers on Ridge Street (a key fundamental part of the traffic analysis) are based on traffic inputs to the Strategic Travel Model which show Ridge Street is the feeder road into the Western Harbour Tunnel. It also notes that this does not align with public information on the Western Harbour Tunnel. This conflict on traffic inputs needs to be addressed. It is showing a 2000% increase on Ridge Street traffic.
7. Preferred carpark access - Ridge Street would be the best location for access and egress for the site as a whole. This should be assessed when correct traffic volumes for Ridge Street are available. The benefits of encouraging Ridge Street for access are the intersection at Ridge and West Street - this is a three way intersection with clear vehicular movement patterns. The other key intersection of Ridge and Miller Street is a signalised four way configuration, which allows for movements in all directions.
8. Safety issues of using Carlow Street as main vehicular access - the Carlow/West/Emmett Street interesection has an offset configuration. Emmett/West Street is diagonally opposite Carlow/ West Street intersection. A zebra crossing is also present on West Street. This ia a very difficult intersection and is used by students from North Sydney Girls walking from the bus stop on Miller Street to their school entranc at the end of Emmett Street. Having the main carpark entrance on Carlow Street will increase traffic at this already difficult intersection and reduce pedestrian safety at the crossing.
9. Building setbacks - the building at the corner of Miller and Carlow street needs to have increased setback from Miller Street and Carlow Street and increased distance to the Marist Brothers residences on Carlow Street. This would reduce the impact of th building on the streetscape, and allow for increased plantings to soften the appearance of the building and provide shade for students.
North Sydney Council
Comment
NORTH SYDNEY , New South Wales
Message
To whom it may concern;
North Sydney Council hereby objects to the Marist Brothers College application (SSD 10473). The details and reasoning for the objection will be provided within the timeframe (extension) granted by DPEI today for submissions to be made by 24 March, 2021.
ROADS AND MARITIME SERVICES DIVISION
Comment
PARRAMATTA , New South Wales
Message
Please refer attached TfNSW response
Attachments
Heritage NSW – Aboriginal cultural heritage (ACH)
Comment
Sydney , New South Wales
Message
HNSW Advice on the EIS attached
Attachments
Heritage NSW – Aboriginal cultural heritage (ACH)
Comment
Sydney , New South Wales
Message
Correction of exhibition notice noted. HNSW has no comments to make with respect to ACH.
ROADS AND MARITIME SERVICES DIVISION
Comment
PARRAMATTA , New South Wales
Message
Please refer attached TfNSW response
Attachments
TRANSPORT FOR NSW
Comment
Chippendale , New South Wales
Message
TfNSW Response
Attachments
North Sydney Council
Comment
NORTH SYDNEY , New South Wales
Message
Ms Hatem,
Further to the telephone message I have left at your extension please note that the proposal is being considered by the elected Council tonight 22/ 3/ 2021, and I am requesting a 48 hour extension in the time available to make a submission on the project.
Please contact me on 9936 8481 (or via email) if you have any questions.

Yours,
Gavin McConnell
Biodiversity and Conservation Division
Comment
PARRAMATTA , New South Wales
Message
Please find attached EES response
Attachments
Biodiversity and Conservation Division
Comment
PARRAMATTA , New South Wales
Message
Please find attached EES response
Attachments
Heritage NSW – HERITAGE COUNCIL OF NSW
Comment
PARRAMATTA , New South Wales
Message
HNSW comments with updated address.
Attachments
Janet Chan
Comment
NORTH SYDNEY , New South Wales
Message
See attached
Attachments
Name Withheld
Object
NORTH SYDNEY , New South Wales
Message
Reasons for Objection (issues raised herewith relate only to Carlow St)
Attachments
Name Withheld
Object
NORTH SYDNEY , New South Wales
Message
As a resident and owner of a property located on XXXXXXX, I have the following concerns on the proposed development as currently planned:
1) Traffic - the increased student intake numbers and proposed entry location, which is on Carlow Street, would add further pressures on the already severely congested streets, including Carlow Street and Miller Street.
2) Parking - the proposed parking building only have 71 extra parking spots, which is disproportionate to the size of the expansion of the school precinct which includes but not limited to a 1500 seat amphitheatre. Without more parking being proposed, it will diminish the existing amenity for residents and local business as well as visitors to St Leonards Park and North Sydney Oval.
3) Noise and Privacy - the open roof top and the balconies which face towards the backyards of several townhouses located on Carlow Street and Cassins Lane will fundamentally reduce the privacy currently enjoyed by the residents living in these townhouses and also will increase noise levels during school hours, especially given that a large proportion of the residents living in the neighbourhood are retirees, who will stay at home for most of the time, or working professionals, who will be more likely to work from home as a new norm in the post-COVID era.

For the above reasons:
1) I oppose the expanded precinct developments as currently planned;
2) I request that the Minister for Planning and Public Spaces direct that a public hearing be held in relation to this development;
3) I request that improved traffic and parking solutions and alternatives be proposed; and
4) I request that the proposed open roof-top space and balconies be removed from the plans to limit additional disruption to the noise levels, privacy and general amenity of neighbouring residents.

Kind regards
A Local Resident
Robert Bradshaw
Object
NORTH SYDNEY , New South Wales
Message
Please read the attached submission below 19 March 2021:
Attachments
Karl Penn
Object
NORTH SYDNEY , New South Wales
Message
Re: Marist Catholic College Redevelopment, 270 Miller Street, North Sydney (SSD-10473)
Karl Penn
XXXXXXXX
North Sydney
NSW 2060

Planning,
My wife and I are on the eastern side of XXXXXXX and have a clear and uninterrupted view of the school, and directly face the proposed development site.

We understand the redevelopment of the Marist School is a necessary part of the strategic plan in this area, but the plans do indicate some issues that will negatively impact the lifestyle of our community, and will also potentially directly impact our day to day lives, during development.

On previous occasions we have had the need to contact the school re excess school noise and inappropriate language in the playground area. In addition, last year we raised concerns with the school regards scheduling of the extended roof structure that was built, which involved literally weeks of noise and disturbance during school holidays. This development included removal of natural habitat too but the day to day impact on our lives was almost unbearable. This was a much smaller scale than the one now proposed.

Re SSD-10473 – It is a substantial development, involving major noise and disruption over many years and we are objecting to the development on the basis we have received no clarification and or assurances re the following:

1. DEVELOPMENT PLAN
The plan details that an extra 71 parking spots will be built for the Stage 1. 5 story building. However the second stage includes development of a second 5 story building with a 1,500 capacity amphitheatre. There is no reference to how vehicle movement and parking will be managed. The area is already under existing high parking pressure, with limited available space, and Councils recent reduction of available all day parking, combined this already takes its toll on both local businesses. The school needs to have a plan for parking that corresponds with the increased traffic movement.

2. TRAFFIC
The planned change of exit/entrance (and drop-off points) on Carlow Street will channel all school traffic onto this minor 2 lane (+ 2 parking lane) street. Carlow Street already becomes clogged during school drop-off times with the 4 other schools in the immediate vicinity. We ask that the Ridge Street or Miller Street entrances be considered.

3. CONSTRUCTION PLAN & NOISE IMPACT
The previous school development work referenced above was limited to weekends and school holidays. We are neighbours to the school and we all live in a high-density area of working residents. We are seeking assurance that the school will schedule work to share the load with its neighbours by avoiding weekend as often as possible but with a minimum guarantee of at least 2 weekends in 4 being designated ‘work free’. Where work is undertaken, limiting start times to 9 am, not 7 am and pre-warning the residential community of upcoming works so we have opportunity to plan too. Where possible, to maintain schedules, and share the impact and disturbance plan work in school times when practical.

4. ENVIRONMENT
The recent roof extension resulted in (what we believe) was un-notified tree removal on the school grounds including removal of a very large, very old Palm Tree where rosellas and flying foxes used to gather. Doing so in a covert manner damages the reputation of the School. There should be transparency on the plan to remove additional trees and how the impact to loss of natural habitat will be mitigated with planned replacements.

We understand this development is seen as necessary progress, but it cannot be allowed to progress without greater consideration for the residents in the area who will have to cope with a very long period of disruption and disturbance.

Yours sincerely,
Karl Penn
Name Withheld
Comment
NORTH SYDNEY , New South Wales
Message
I’ve just moved into to XXXXX in North Sydney to avoid the construction noise/vibration/disruption on Pacific Highway / Berry St related to new transport and building infrastructure.

Worth works neighbouring one of the most quietest and suburban locations within North Sydney, it is unreasonable to permit construction activities on the weekend, particularly during the construction window proposed on Saturday. Therefore, I request a reconsideration of any weekend works and limiting it as far as practically possible.
Name Withheld
Support
NORTH SYDNEY , New South Wales
Message
I am the occupant of XX XXXXXX Street. We are right next door to the proposed development. The closet neighbour of the development. The development of the Marist Catholic College site is necessary. Especially, if the school is to maintain it valued contribution the North Sydney community since 1888. New times require new facilities if Australian education is to keep up with world trends. Especially in providing co-education for Australian girls. I recognise that any construction, especially so close to us will affect us, both during construction and when the building is in service. We accept this as a necessary contribution to the services that will be provided for young people. College leadership has reached out to us and to the community for many, many months. Going forward, I am confident in the good faith of the leadership to listen to, appreciate, and take into consideration the concerns of the schools neighbours. I support the development.
Graham Selkirk
Comment
NORTH SYDNEY , New South Wales
Message
Submission SSD-10473 – Marist Catholic College North Shore
This submission is provided by the Body Corporate of XX XXXXX XXXXXX North Sydney NSW 2060 and supports the shop owners between Miller Street and West Street. We are in broad support of the proposal although have some concerns as indicated here. We do not agree with the “the Residents X, Cassins Avenue North Sydney” assertions the “..we ask why it is not simpler to use the existing Ridge Street …..entr[y]” because of the immense disruption to the proposal such a change would bring.
The residents of Ridge Street wish to bring to your notice that we are not in any way aligned with a submission concerning SSD-10473 from “The residents X, Cassins Avenue North Sydney” which may indicate otherwise.
Indeed, whilst there are elements within the Marist Catholic College North Shore SSD-10473 that would give us concern as follows, the proposal, in the sense of progress must proceed, is robust and would seem appropriately structured given the constraints of the site from a project management viewpoint:
• Introduction of an auditorium seating 1528 with additional parking for only 71 cars seems to lack logic as the parking currently immediately available is at overload now.
• Any forcing of local traffic into Ridge Street due to construction traffic movements in Miller Street and Carlow Street during the school drop-off and pick-up times will create increased havoc to traffic flows between West Street and Miller Street and higher risk of accidents to children on foot during these periods.
• The following two paragraphs reproduced from the Traffic Management Plan fail to emphasis the marked difference between the functional usefulness of the streets due to the reduction in width of Ridge Street to accommodate the two-way bicycle way – effectively 2.5m and sufficient reduction to make it impossible for a refuse truck or school bus and a car to pass safely. This is important because of the notion raised by the “The residents X, Cassins Avenue North Sydney.” Suggesting construction traffic should be redirected through Ridge Street.
• The Traffic Management Plan fails to identify that street signs have been quite scurrilously moved between Ridge/Miller Street and Carlow/Miller Street. That is, a “No Entry - Limit 3t” sign has been moved from Ridge/Miller Street and re-erected on the corner of Carlow/Miller Street – perhaps to work in favour of no construction traffic into Carlow Street and therefore no entry to Cassins Avenue. Similarly, with no weight limit in play on Ridge Street any longer, the same proponent of the weight limit for Carlow Street appears to have thought the placement of two signs (one on each corner) at Ridge/Miller Street indicating “No Left Turn – Vehicles under 9M Excepted” would allow construction to enter Ridge Street from Miller Street.
The following two paragraphs are extractions from an excellently prepared Traffic Management Plan that is part of the submission accompanying SD-SSD-10473. The plan does not address the turmoil that Ridge Street small to medium business enterprises and private owners/residents have been subjected to over an extended period in support of North Sydney Council efforts to support the St Mary’s Church since 2018 because of construction disruption caused by:
• A dedicated pedestrian crossing for the St Mary’s school children – two complete iterations of the design and construction of the crossing.
• The construction of the two-way bicycle way east to west along Ridge Street between Miller Street and West Street, and
• The expansion of the St Mary’s Primary School by way of the demolition of the residence at 34 Ridge Street and construction of handsome two-story school.
Carlow Street
2.2.2 Carlow Street Carlow Street is a local road, aligned in an east-west direction between Miller Street and West Street. This road travels along the northern boundary of the site. It is generally configured as a two-way road with two traffic lanes and kerbside parking, across a 11.7 m wide road carriageway (kerb to kerb). It has a posted speed limit of 50km/h, with 40km/h school zone restrictions that apply between 8:00am and 9:30am and between 2:30pm and 4:00pm Monday to Friday.
Ridge Street
2.2.3 Ridge Street Ridge Street is a local road, aligned in an east-west direction between Miller Street and West Street. This road travels along the southern boundary of the site. It is configured as a two-way road with two travel lanes and kerbside parking, across a 9.3 m wide road carriageway (kerb to kerb). In addition, a bidirectional separated cycleway is provided along the northern side of the road. It has a posted speed limit of 50km/h, with 40km/h school zone restrictions that apply between 8:00am and 9:30am and between 2:30pm and 4:00pm Monday to Friday.
Summary
We believe that, in general, Application No SSD-10473 should proceed, however, objections raised that seek to have construction traffic redirected to Ridge Street should be rejected as fraught and disruptive. Further, the apparent scurrilous behaviour by person or persons unknown to alter street signage to meet claims raised to redirect construction should be immediately reversed and action taken as necessary to ensure such behaviour is prevented in future serious significant development applications.

Graham Selkirk
Owners Corporation
XX XXXXX XXXXXX
North Sydney
Owners Corporation Committee 7-21 Carlow St & 2-10 Cassins Avenue ,N.Sydney
Object
NORTH SYDNEY , New South Wales
Message
I am Chairman of the Owners Corporation Committee for the townhouses and apartments located at XX-XX Carlow St and XX-XX Cassins Avenue ,North Sydney and lodge this submission on behalf of our Committee and the owners of the 12 townhouses and 12 apartments which make up our complex , which is located immediately adjacent to Marist College Catholic School North Shore.
In earlier letters dated 18 August 2020 and 2 December 2020 to the Principal of Marist Catholic College , the General Manager of North Sydney Council and Urbis Consultants , we have drawn their attention to the proposed traffic management and parking plans for the expanded precinct , and registered our strong concerns about the implications for traffic flows,e specially in Carlow Street .
Carlow St ,Miller St and West St are already severely congested during drop-off and pick-up times for the existing school and early learning facilities. Entry to and especially exit from Carlow St in peak morning and afternoon times is very slow with extensive delays for motorists. This also occurs when events are held at St Leonards Park /North Sydney Oval of an afternoon ,evening and weekends .

Several members of our Committee attended in the Online Information session in October 2020 and we were also given a further discussion with Urbis consultants in December 2020 .We appreciated these opportunities to share information and learn more .
However :
-The information provided at the online session on 22 October especially highlighted the impracticability of the proposal for the bulk of the precinct traffic to enter and exit from Carlow St .An explanation that traffic will be permitted to turn right into Carlow St on exiting the drop-off and pick-up zones is just one example of a serious misunderstanding of traffic flows and issues .
-Our discussions with Urbis and several of the traffic consultants in December provided more in-depth information on the traffic and parking plans but information that we were told would be provided after this online meeting ,including how Green Traffic plans have been successfully implemented and managed overseas was not sent to us .

Within the above context , and based on the information we have been provided to-date ,we offer the following observations and serious concerns :
.1. The traffic surveys undertaken to-date appear to have been done over too small an area ,and not to have included traffic flows in streets such as Hayberry , West ,Mrytle, Burlington ,Ernest Sts etc which feed into and are impacted by school traffic flows .Nor have they made convincing reference to understanding traffic flows from Tucker St into and out of Carlow St with students of North Sydney Boys High ..directly opposite the proposed entry to the parking building for the expanded precinct .
.2. Much emphasis is placed in the Development Application to a Green Traffic Plan as a cure to the traffic and parking issues of the expanded precinct .Quite candidly , this appears to be a relatively academic and contemporary use of in- vogue language as opposed to a practical solution to the current and prospective issues .Despite undertakings given to us , no evidence has been provided on the claims made to-date by the traffic consultants that Green Traffic Plans have worked offshore .The proposed plan also appears to not factor in the socio -economic characteristics of the lower North Shore and the relatively high level of car ownership and usage by parents and people going to and from work .
.3. Reference was made by the traffic consultants in our December meeting to situations overseas where Green Traffic Plans for similar developments have been accompanied by measurable milestones to quantify the degree to which the traffic and parking plans are being realised .No such milestones are included in the current Development Application .Why not ?
.4. Strong emphasis is also being placed on students (and staff ) using public transport and especially buses .Yet several of the owners in our complex can state cases of students not using buses , especially after school , as they are full by the time they get to Marist College on Miller St .Students appear to acknowledge this in the traffic plan
. 5. Indications from our discussions are that no consideration is being given to alternative traffic and parking options or any variations to the current plans .Consistent reference is made to the State Government and North Sydney Council being firm on not allowing additional traffic to enter or exit onto Miller and Ridge Sts ,leaving Carlow as the only option ; and to the current church car park not being available for any parking for the expanded precinct as it has to be used for a public precinct . Yet no reference exists in the proposals to the expanded use of roundabouts ( eg at the intersection of West and Carlow Sts etc ) to help traffic flows or to the option of using some or all of the current church car park to accommodate the increased parking and traffic flows caused by the expanded precinct as opposed to trying to serve a "nice-to -have "public interest .
.6. The proposal that the parking building for the first stage 5-level building will have an extra 71 parking spots ,but none for the second stage,( which includes a 1500 seat ampitheatre ) seriously understates the parking required for the expanded complex .Without for more parking than is being proposed ,it serves to highlight that the proposed precinct represents a serious over development for what is a residential area , and one which will fundamentally inconvenience and diminish the exiting amenity for residents and local businesses ..and for visitors to St Leonards Park and North Sydney Oval , which are regularly used for events during the week as well as at weekends .
Residents of our complex also have significant concerns in relation to:
- the height of the 5-storey Stage One building reducing existing sunlight levels and creating additional shadowing for residents at the eastern end of our complex
-the proposed open roof top space ,which will be used for recreational purposes , further adding to already significant existing noise levels from the school, even before an additional 800 students are added .
-the open roof top and the balconies which will face towards our complex fundamentally reducing the privacy currently enjoyed by our owners in Carlow St and Cassins Lane

For the above reasons ,and as no evidence exists that our earlier letters and representations have been listened to :
.1. We oppose the expanded precinct development as currently planned :
.2. We request that the Minister for Planning and Public Spaces direct that a public hearing be held in relation to this development .
.3. We request that the traffic and parking surveys be prepared with wider and broader attention to traffic flows in the area surrounding Marist College and Carlow St and that improved traffic and parking solutions and alternatives be proposed .
.4. We request that Urbis and the traffic consultants provide the evidence that is said to exist that Green Traffic Plans work successfully ,and that this be translated into measurable milestones of success for the development if approved .
.5. We require that as a condition of the development that all existing street parking that exists in Carlow St, Cassins Lane and surrounding streets must be retained now and in the future for the benefit of residents and local businesses ,and as evidence that the State Government and North Sydney Council are sincere in their belief that the parking proposed by the development is sufficient .
.6. We request that the proposed open roof-top space and balconies be removed from the plans to limit additional disruption to the noise levels , privacy and general amenity of neighbouring residents.
.7. We request that if the development is approved , construction be limited to 9.00 am to 3.00 pm on weekdays so that existing traffic and parking issues are not exacerbated ,and that no weekend work is permitted for the benefit of local residents and given the heavier use of St Leonards Park and North Sydney Oval on weekends .

We are prepared to further speak to and consult on these matters if it would be helpful .


.

Pagination

Project Details

Application Number
SSD-10473
Assessment Type
State Significant Development
Development Type
Educational establishments
Local Government Areas
North Sydney
Decision
Approved
Determination Date
Decider
Executive Director

Contact Planner

Name
Jasmine Tranquille