Liverpool Hospital Multi-storey Carpark

Liverpool City

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Construction and operation of a seven level carpark at Liverpool Hospital, including: multi-level and at-grade carparks with 1,097 car parking and 55 motorcycle parking spaces; demolition works; remediation works; road connections; and landscaping.

Consolidated Consent

Consolidated Consent

Archive

Notice of Exhibition (1)

Exhibition Notice

Request for SEARs (1)

Scoping Report 281019

SEARs (1)

Issued SEARs_27112019_043928

EIS (41)

Z_Survey_Part4
Z_Survey_Part3
Z_Survey_Part2
Z_Survey_Part1
Y_Section 10.7 Certificate
X_Consultation Summary Report
W_Operation Waste Management
V_Construction Waste Management Plan
U_BCA and DDA Capability
T_Structural Statement
S_Geotechnical ReportRD
R_BDAR
Q_Stormwater and Flooding Report
P_Infrastructure Management Plan
O_Hazardous Building Materials Survey
N3_Acid Sulfate Soils Management Plan
N2_Remediation Action Plan
N1_Contamination Assessment_Part2
N1_Contamination Assessment_Part1
M_Acoustic Report
_LHAP Multi Storey Carpark EIS
L_Aboriginal Cultural Heritage AssessReport_Part4
L_Aboriginal Cultural Heritage AssessReport_Part2
L_Aboriginal Cultural Heritage AssessReport_Part1
K_Statement of Heritage Impact
J_Water Management Plan
I_Wind Report
H_ESD Report
G_Preliminary Construction Management Plan
F2_Parking Demand Study
F1_Transport and Traffic Report
E_Landscape Design Report
D_Landscape Plans
C_Architectural Design Report
B_Architectural Plans_Part6
B_Architectural Plans_Part5
B_Architectural Plans_Part4
B_Architectural Plans_Part3
B_Architectural Plans_Part2
B_Architectural Plans_Part1
A_SEARs

Response to Submissions (1)

Request RTS_13072020_023304

Amendments (19)

MSCP RTS Amend Report FINAL
Appendix E - MSCP Additional TIA
Appendix L - MSCP Overland Flow Paths plans
Appendix H - MSCP Traffic RTS
Appendix C - MSCP Architectural Plans
Appendix N - MSCP Consultation Summary Report
Appendix J - MSCP Wind Statement
Appendix F - MSCP Additional Acoustic
Appendix D - MSCP Landscape Plans
Appendix A - MSCP Response to Submissions
SSD10388 MSCP RTS HI Cover Letter
Appendix M - MSCP Construction Management Plan
Appendix K - MSCP TTW with Sydney Trains
Appendix I - MSCP Geotech Sydney Trains Response
Appendix G - MSCP Architectural RTS
Appendix F - MSCP Acoustic Logic Accreditation
Appendix D - MSCP Landscape RTS
Appendix D - MSCP Landscape Design Report
Appendix B - MSCP Architectural Design Report

Additional Information (5)

RFI Request for Additional Information_13102020_031939
MSCP RFI Response - Letter
C_Additional tree planting plan
B_Aviation statement
A_MSCP RFI Response Table

Determination (5)

SSD-10388 Notice of Determination
SSD-10388 Approved Plans
SSD-10388 Notice Of Decision
SSD-10388 Development Consent
Assessment Report (SSD-10388 and SSD-10389)

Approved Documents

Management Plans and Strategies (11)

SSD10388 LHMSCP CTPMSP B13
SSD10388 LHMSCP CEMP B12 B13 B14 B15
DPE approval letter_Upd StagRep_LHMSCP
SSD-10388 Updated Staging Report
LHMSCP_Staging Report Rev 1.1
SSD10388 LHMSCP CTPMSP B13 v1
Archaeological Research Design and Excavation Methodology (Rev 1, 5 Feb 21) - Approval Letter Dated 18 Feb 21
Archaeological Research Design and Excavation Methodology (Rev 1, 5 Feb 21)
Approval of Plan Strategy or Study4507694
CEMP_V12 22.06.22
SSD10388 B11-B15 CEMP Cover Letter

Reports (4)

SSD10388 LHR MSCP PCCR v2
D21 Validation Repot - DPE Acknowledgement Letter 26102022
D21 Validation Report - 27092022
D21 Validation Report - HINSW Cover Letter 12102022

Independent Reviews and Audits (3)

Audit reports_02082021_045710
SSD10388 LHR MSCP IEA Prop Response
SSD10388 IEA LHR MSCP IEA 1

Other Documents (6)

SSD10388 LHMSCP B6 Dilap Report
LHAP MSCP External Wall Disclosure Statement
DPE acknowledgement letter
SSD10388 D22 Site Audit Report Cover Letter
Staging Report R2 (Rev D, 22/01/2021) - Approval Letter dated 18/02/21
Staging Report R2 (Rev D, 22/01/2021)

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

There are no inspections for this project.

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 1 - 9 of 9 submissions
Name Withheld
Support
OATLANDS , New South Wales
Message
The new Car park is required and will be an important asset.
However I make this submission as a bicycle rider. This is a personal submission but I am a member of the Liverpool Bicycle Users Group.
The report indicates that 50 bicycle parking spaces will be provided. That number was based at the lowest limit of the quoted guide of 5% to 10%.
Why not adopt the upper figure and provide 100 bicycle spaces?
Bicycle spaces have to be well located in well lit areas easily accessible without traversing through car driveways. Locked cages are best for staff.
Bicycle sales have boomed in the current COVID crisis. The demand for bicycle parking will increase.
Biodiversity and Conservation Division
Comment
,
Message
EES submission on the EIS attached 22 June 2020
Attachments
ENVIRONMENT PROTECTION AUTHORITY
Comment
Sydney , New South Wales
Message
Please see attached
Attachments
LIVERPOOL CITY COUNCIL
Comment
Liverpool , New South Wales
Message
Please find attached response letter from Liverpool City Council
Attachments
Department of Transport
Comment
Chippendale , New South Wales
Message
TfNSW Response
Attachments
ROADS AND MARITIME SERVICES DIVISION
Comment
PARRAMATTA , New South Wales
Message
The response was provided earlier by TfNSW
Attachments
Sydney Water
Comment
Parramatta , New South Wales
Message
see attached
Attachments
Civil Aviation Safety Authority
Comment
Canberra , Australian Capital Territory
Message
see attached
Attachments
Endeavour Energy
Comment
Huntingwood , New South Wales
Message
see attached
Attachments

Pagination

Project Details

Application Number
SSD-10388
Assessment Type
State Significant Development
Development Type
Hospitals, medical centres and health research facilities
Local Government Areas
Liverpool City
Decision
Approved
Determination Date
Decider
Executive Director
Last Modified By
SSD-10388-Mod-1
Last Modified On
09/12/2021

Contact Planner

Name
Megan Fu