State Significant Development

Determination

Harbourside Bulk Excavation Works

City of Sydney

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Bulk excavation works

Attachments & Resources

Notice of Exhibition (1)

EIS (23)

Response to Submissions (16)

Agency Advice (15)

Additional Information (17)

Recommendation (2)

Determination (4)

Approved Documents

Management Plans and Strategies (6)

Independent Reviews and Audits (1)

Notifications (1)

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

There are no inspections for this project.

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 1 - 3 of 3 submissions
City of Sydney
Comment
SYDNEY , New South Wales
Message
Attachments
Bruce Hunter
Object
SYDNEY , New South Wales
Message
Traffic management and access
The IES seems to concentrate on vehicle access no pedestrian and disabled access during demolishing and excavation. This misses these potential issues:
• The intersection of Darling Drive, Murray St and Pyrmont Bridge Rd is already subject to heaving vehicle and pedestrian traffic. The use as the major thoroughfare for trucks (estimated 100 loads per day) to and from the development site will exacerbate this issue. The have been significant pedestrian accidents and narrow escapes on this intersection. The Traffic Management Plan only seems to deal with pedestrian access around the site, not impact to pedestrians in the area.
• Pedestrian and cycle traffic during peak hours to Pyrmont Bridge is intense in both directions. The plan does not seem to address this.
• The existing public bridge at the northern end of Harbourside provides key alternate access to Pyrmont Bridge from Murray St for nearby residents and hotel accommodation. The bridge and associated lift allows safe access bypassing the above intersection for both disabled and ambulant pedestrians. There is nothing in the plan that provides assurance that THIS access will be maintained throughout the demolition, excavation, and construction phases of the project.
• The plan must identify these issues and controls planned to alleviate them.
Heritage
It is good to see that the heritage saltwater cooling conduits from Ultimo Powerhouse have been identified. There does not seem to be a specific commitment to preserve these as a remaining relic of the extended historic powerhouse infrastructure.
Public Domain
Again, the public domain of the northern bridge and lift accessing Pyrmont Bridge as affected public domain. The plan must address how this essential access asset will be preserved during the project.
Noise and vibration
It is good to see that noise and vibration monitors will be installed and monitored for excess levels. Noise level has the potential to reduce the quality of life for adjacent residents. The Noise and Vibration Management Plan does not deal with traffic noise from construction traffic queuing, entering, or leaving the site. The plan should address this issue as well as controls on traffic queuing that would give rise to excessive and persistent noise. Hours of work to the site must ensure that construction traffic is not queued waiting star of work times.
Vibration from excavation could potentially damage adjacent buildings on Murray St. The Noise and Vibration Plan must commit to ensuring no damage will be caused to existing structures in adjacent buildings and full and prompt remediation of any damage caused.
Godfrey Franz
Object
GOSFORD , New South Wales
Message
The plan to build a large bulky Central Barangaroo is ugly and will block views of the bridge and the rocks! Sydney's so called working harbour look and feel will be damaged. You should go back to the smaller less bulky plan from 10 years ago

Pagination

Project Details

Application Number
SSD-38881729
Assessment Type
State Significant Development
Development Type
Residential & Commercial
Local Government Areas
City of Sydney
Decision
Approved
Determination Date
Decider
Director

Contact Planner

Name
Annika Hather