Skip to main content

State Significant Development

Determination

First Building Bradfield City Centre

Liverpool City

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Construction, fitout and use of the proposed First Building as an advanced manufacturing research and development facility, including site preparation works, site access and parking, utilities infrastructure and landscaping

Attachments & Resources

Notice of Exhibition (1)

Notice of Exhibition_19112021_084504

Request for SEARs (3)

Bradfield First Building Scoping Report
First Building Bradfield City Centre site plan
Attachment A Preliminary Architectural Drawing

SEARs (3)

Issued SEARs
Attachment 2 - Agency comments
Issued SEARs Cover Letter

EIS (24)

EIS First Building Bradfield SSD 25452459v2
Appendix A - Cost Estimate Summary
Appendix B - SEARs
Appendix C (i) - Architectural Plans
Appendix C (ii) - Architectural Design Report
Appendix D (i) - Civil Engineering Plans
Appendix D (ii) - Civil Design Report
Appendix E - Consultation Outcomes Summary Report
Appendix F - Draft Aerotropolis Precinct Plan
Appendix G - Objectives Aerotropolis Core Precinct
Appendix H - Draft Aerotropolis Phase 2 DCP
Appendix I (i) - Contamination Investigation
Appendix I (ii) - Aerotropolis Core, Review of Con
Appendix J - Bushfire Hazard Assessment
Appendix K - Statement of Heritage Impact
Appendix L (i) - Preliminary ACHAR redacted
Appendix L (ii) - Consultation Log redacted
Appendix M - Environmental Sust Design Report
Appendix N - Traffic Impact Assessment
Appendix O - Construction NVIA
Appendix P - Operational NVIA
Appendix Q - Air Quality Impact Assessment (1)
Appendix R - Flood Impact Assessment
First Building - Equipment Costs for CIV

Response to Submissions (27)

Response to Submissions Report (updated)
Appendix A - RTS Table (updated)
DPIE Request RTS Letter
DPIE Additional Matters for Submissions Report
Appendix B - Mitigation Measures
Appendix C - Updated Architectural Set
Appendix D - State Design Review Panel 1
Appendix E - State Design Review Panel 2
Appendix F - Updated DCP Phase 2 Assessment
Appendix G - Landscape Design Plans
Appendix H - Visual Impact Assessment
Appendix I - Updated Civil Design Plans
Appendix J - Traffic Response
Appendix K - Const_Noise and Vibration Impact Assess
Appendix L - Oper_Noise and Vibration Impact Asses
Appendix M - ESD Report
Appendix M(i) - ESD Response to DCP Phase 2
Appendix N - Statement of Heritage Impact
Appendix O - Air Quality Impact Assessment
Appendix P - Preliminary Arboricultural Report
Appendix Q - DSI_First Building_Rev2
Appendix Q(i) - Site Audit Statement
Appendix S - WSAP
Appendix T - Precinct Plan
Appendix U - Supplementary_Flood Advice
Appendix V - Plan of Subdivision
Appendix W - Aboriginal memo

Agency Advice (8)

RFS - Advice on EIS
Sydney Water - Advice on EIS
DPIE Water - Advice on EIS
Heritage NSW ACH - Advice on EIS
Heritage Council of NSW - Advice on EIS
EES - Advice on EIS
Liverpool Council - Advice on EIS
TfNSW - Advice on EIS

Determination (3)

SSD-25452459 Assessment Report
SSD-25452459 Instrument of Consent
SSD Notice of Decision

Approved Documents

Management Plans and Strategies (3)

SSD-254524259 - Approval of Stage 1 CEMP
SSD-25452459 - Notice of Commencement DPE Letter
First Building - FINAL Staging and Stage 1 CEMP

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

There are no inspections for this project.

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 1 - 7 of 7 submissions
Endeavour Energy
Comment
HUNTINGWOOD , New South Wales
Message
Please refer to the attachments.
Attachments
CASA Aviation Group
Comment
Phillip , Australian Capital Territory
Message
Attachments
Name Withheld
Support
CABRAMATTA , New South Wales
Message
Please ensure the proposed road reserve and finish levels of 'Central Loop West' aligns and provide appropriate connectivity to facilitate future development of the properties along the rear of 155 to 205 Badgerys Creek Road.

Finished levels and road reserves should allow for future connectivity such as drainage, utilities, pedestrian and vehicular access.

There should not be narrow residue lot/s between these private properties and the road reserve as this will impede future access and connectivity to the road system.

Road construction should be entirely constructed to full widths with proper kerb, gutters, pedestrian paths on both sides, and permanent stormwater drainage pipes/systems.

Furthermore, the proposed road, 'Innovation North', should be moved slightly south so that the intersection with 'Central Loop Road' aligns in the centre of the common boundary of 145 and 155 Badgerys Creek Road to facilitate future half-road construction between these lots and connectivity to the intersection.
Name Withheld
Comment
BRINGELLY , New South Wales
Message
Please ensure the proposed road reserve and finish levels of 'Central Loop West' aligns and provide appropriate connectivity to facilitate future development of the properties along the rear of 155 to 205 Badgerys Creek Road.
Finished levels and road reserves should allow for future connectivity such as drainage, utilities, pedestrian and vehicular access.
There should not be narrow residual lot/s between these private properties and the road reserve as this will impede future access and connectivity to the road system.
(See attachment and location marked "A")

Furthermore, the proposed road, 'Innovation North', should be moved slightly south so that the intersection with 'Central Loop Road' aligns in the centre of the common boundary of 155 and 145 Badgerys Creek Road to facilitate future half-road construction between these lots and connectivity to the intersection.
(See attachment and location marked "B")
Attachments
LIVERPOOL CITY COUNCIL
Comment
LIVERPOOL , New South Wales
Message
Liverpool City Council's submission
Attachments
Western Sydney Airport
Comment
Liverpool , New South Wales
Message
Attachments
Western Sydney Planning Partnership
Comment
Parramatta , New South Wales
Message
Attachments

Pagination

Project Details

Application Number
SSD-25452459
Assessment Type
State Significant Development
Development Type
Other manufacturing
Local Government Areas
Liverpool City
Decision
Approved
Determination Date
Decider
Director

Contact Planner

Name
Pamela Morales