Skip to main content

State Significant Development

Determination

Aspect Industrial Estate

Penrith

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

The proposed development seeks approval for earthworks, infrastructure and roads across the entire site, and the staged construction of warehouse and logistics facilities with associated car parking across 11 developable lots.

Consolidated Consent

SSD-10448 Consolidated Consent (to MOD-3)

Archive

Notice of Exhibition (1)

Notice of Exhibition_18112020_074120

EIS (51)

10-11-20 - Environmental Impact Statement
10-11-20 - EIS Appendix A SEARs
10-11-20 - EIS Appendix B QS CIV
10-11-20 - EIS Appendix C Concept Masterplan
10-11-20 - EIS Appendix D Stage 1 Architectural Drawings
10-11-20 - EIS Appendix E Architectural Concept Report
10-11-20 - EIS Appendix F1 Civil Stage 1 Drawings
10-11-20 - EIS Appendix F2 Civil Stage 1 Drawings
10-11-20 - EIS Appendix F3 Civil Stage 1 Drawings
10-11-20 - EIS Appendix F4 Civil Mamre Road Drawings
10-11-20 - EIS Appendix G Civil Report
10-11-20 - EIS Appendix H Landscape Masterplan
10-11-20 - EIS Appendix I1 Landscape Stage 1 Drawings
10-11-20 - EIS Appendix I2 Landscape Stage 1 Drawings
10-11-20 - EIS Appendix J Urban Design Report
10-11-20 - EIS Appendix K Traffic Assessment
10-11-20 - EIS Appendix L Visual Impact Assessment
10-11-20 - EIS Appendix M Aboriginal Assessment Report
10-11-20 - EIS Appendix N Non-Aboriginal Report
10-11-20 - EIS Appendix O Biodiversity Report
10-11-20 - EIS Appendix P Vegetation Management Plan
10-11-20 - EIS Appendix Q Riparian Lands Assessment
10-11-20 - EIS Appendix R Bushfire Assessment
10-11-20 - EIS Appendix S Contamination Phase 1 Report
10-11-20 - EIS Appendix T Contamination Phase 2 Report
10-11-20 - EIS Appendix U Imported Fill Protocol
10-11-20 - EIS Appendix U2 Remediation Action Plan
10-11-20 - EIS Appendix V Unexpected Finds Protocol
10-11-20 - EIS Appendix W Dam Dewatering Report
10-11-20 - EIS Appendix X Ground Water Management Plan
10-11-20 - EIS Appendix Y Waste Management Plan
10-11-20 - EIS Appendix Z1 Geotech Earthworks Specification
10-11-20 - EIS Appendix Z2 Geotechnical Investigations
10-11-20 - EIS Appendix Z3 Geotechnical Interim Design Advice
10-11-20 - EIS Appendix AA Flood Risk Assessment
10-11-20 - EIS Appendix BB Flood Impact Assessment
10-11-20 - EIS Appendix CC Energy Efficiency Report
10-11-20 - EIS Appendix DD Air Quality and Odour Impact
10-11-20 - EIS Appendix EE Noise and Vibration Impact
10-11-20 - EIS Appendix FF Aeronautical Impact Assessment
10-11-20 - EIS Appendix GG Social Impact Assessment
10-11-20 - EIS Appendix HH1 Fire Safety Strategy Masterplan
10-11-20 - EIS Appendix HH2 Fire Safety Strategy Stage 1
10-11-20 - EIS Appendix II BCA Compliance Report
10-11-20 - EIS Appendix JJ Site Survey
10-11-20 - EIS Appendix KK AIE DCP
10-11-20 - EIS Appendix LL DCP Matrix
10-11-20 - EIS Appendix MM Engagement Report
10-11-20 - EIS Appendix PP Subdivision Plan
10-11-20 - EIS Appendix QQ Strategic Planning Memo
10-11-20 - EIS Appendix OO Site Contamination Audit

Response to Submissions (45)

22-12-20 - RtS Request Letter
22-12-20 - RtS Request Attachment 1
11-03-21 - Response to Submissions (RtS)
11-03-21 - RtS Appendix A Amended Concept Plan
11-03-21 - RtS Appendix B1 Estate Staging Plan
11-03-21 - RtS Appendix B2 Temporary Real Estate Signage Plan
11-03-21 - RtS Appendix B3 Fire Protection Plan
11-03-21 - RtS Appendix B4 Zoning Plan
11-03-21 - RtS Appendix B5 Stage 1 and Landscape Masterplan
11-03-21 - RtS Appendix B6 Landscape Section
11-03-21 - RtS Appendix C1 General Arrangement Plan
11-03-21 - RtS Appendix C2 Road 03 Access Plan
11-03-21 - RtS Appendix C3 Driveway Sight Lines
11-03-21 - RtS Appendix C4 Riparian Corridor Concept Plan
11-03-21 - RtS Appendix C4 Riparian Corridor Sections 1
11-03-21 - RtS Appendix C4 Riparian Corridor Sections 2
11-03-21 - RtS Appendix C5 Stormwater Basin Layout Plan
11-03-21 - RtS Appendix D1 Subdivision Plan Stage 1
11-03-21 - RtS Appendix D2 Subdivision Plan Stage 2
11-03-21 - RtS Appendix E Acoustic Report
11-03-21 - RtS Appendix F AGV Connection Plan
11-03-21 - RtS Appendix G Biodiversity Assessment Report
11-03-21 - RtS Appendix H Flora and Fauna Management Plan
11-03-21 - RtS Appendix I Riparian Lands Assessment
11-03-21 - RtS Appendix J Vegetation Management Plan
11-03-21 - RtS Appendix K Landscape and Visual Analysis
11-03-21 - RtS Appendix L Waste Management Plan
11-03-21 - RtS Appendix M Traffic and Transport Memo
11-03-21 - RtS Appendix N Framework Sustainable Travel Plan
11-03-21 - RtS Appendix O1 Flooding Memo response to RtS
11-03-21 - RtS Appendix O2 Flood Impact Assessment
11-03-21 - RtS Appendix O3 Flood Risk Assessment
11-03-21 - RtS Appendix P Wildlife Hazard Memo
11-03-21 - RtS Appendix Q Civil Engineering Memo
11-03-21 - RtS Appendix R Interim Waterway Health Paper
11-03-21 - RtS Appendix S Sydney Water Correspondence
11-03-21 - RtS Appendix T NRAR Correspondence
11-03-21 - RtS Appendix U AIE Site Specific DCP
11-03-21 - RtS Appendix V Aboriginal Artefacts Reburial Method
11-03-21 - RtS Appendix W Maximum Harvestable Right Calculator
11-03-21 - RtS Appendix X Indicative Utilities Plan
11-03-21 - RtS Appendix Y1 Filterra OM Manual
11-03-21 - RtS Appendix Y2 Filterra - Technical Design Guide
11-03-21 - RtS Appendix Y3 Ocean Protect Advice
11-03-21 - RtS Appendix Y4 Review of Filterra System

Agency Advice (13)

SEARs Advice - Department of Primary Industries Agriculture
SEARs Advice - Environment, Energy and Science Group DPIE
SEARs Advice - EPA
SEARs Advice - Penrith City Council
SEARs Advice - TfNSW
SEARs Advice - TfNSW Attachment
SEARs Advice - Water DPIE & NRAR SEARs Advice
SEARs Advice - Water NSW
RtS Advice - EES Group DPIE
RtS Advice - Heritage NSW ACH
RtS Advice - Penrith City Council
RtS Advice - TfNSW
RtS Advice - Water Group & NRAR

Additional Information (36)

29-03-21 - RFI Request for Additional Information
30-03-22 - RFI Request for Additional Information
30-03-22 - Integrated Water Cycle Management Review of Aspect Industrial Estate
12-05-22 - Amended Development Report Submission Cover Letter
12-05-22 - Section 37 Request to Amend SSD-10448
12-05-22 - Amended Development Report (ADR)
12-05-22 - ADR Appendix A1 Estate Masterplan
12-05-22 - ADR Appendix A2 Estate Works Staging Plan
12-05-22 - ADR Appendix A3 Revised Stage 1 Architectural Plans
12-05-22 - ADR Appendix B Landscape Plans
12-05-22 - ADR Appendix C Landscape Character and Visual Impact Assessment
12-05-22 - ADR Appendix D1 Revised Civil Plans
12-05-22 - ADR Appendix D2 Civil Statement
12-05-22 - ADR Appendix D3 Building Envelope Level Comparison
12-05-22 - ADR Appendix E Subdivision Plans
12-05-22 - ADR Appendix F1 TfNSW Letter November 2021
12-05-22 - ADR Appendix F2 TfNSW Letter January 2022
12-05-22 - ADR Appendix F3 Construction Traffic Memo dated 28 April 2022
12-05-22 - ADR Appendix F4 TIA Summary Memo dated 5 May 2022
12-05-22 - ADR Appendix G1 Noise Addendum Letter May 2021
12-05-22 - ADR Appendix G2 Noise Addendum Letter August 2021
12-05-22 - ADR Appendix G3 Noise Addendum Letter April 2022
12-05-22 - ADR Appendix H1 BDAR Cover Letter
12-05-22 - ADR Appendix H2 Revised BDAR
12-05-22 - ADR Appendix I1 ACHAR Cover Letter
12-05-22 - ADR Appendix I2 Revised ACHAR Redacted
12-05-22 - ADR Appendix J1 AIE Waterway Health Concept Master Plan Options 1-3
12-05-22 - ADR Appendix J2 AIE Waterway Health Stage 1 Development
12-05-22 - ADR Appendix K Detailed RFI Response Matrix
12-05-22 - ADR Appendix L AIE - Document Schedule
12-05-22 - ADR Appendix M AIE Warehouse 3 Use Clarification
12-05-22 - ADR Appendix N Groundwater Management Plan
12-05-22 - ADR Appendix O Dam Decommissioning Strategy
12-05-22 - ADR Appendix P Air Quality Statement dated 5 May 2022
12-05-22 - ADR Appendix Q RAP dated 4 May 2022
12-05-22 - ADR Appendix R VPA 788-882 Mamre Road Kemps Creek (Signed)

Recommendation (2)

SSD-10448 Draft Recommended Conditions
SSD-10448 Assessment Report Recommendation

Determination (3)

SSD-10448 Signed Consent
SSD-10448 Notice of Decision
SSD-10448 Assessment Report

Approved Documents

Management Plans and Strategies (54)

SSD-10448-PA-68- AIE Warehouse 1 CEMP Review
SSD-10448-PA AIE Warehouse 1 CEMP Approval Memo
Appendix C - Consultation Correspondence
Appendix A - Building Staging Plan
SSD 10448 Staging Plan 28 Jul 2022
Warehouse 1 CEMP Appendix A - Consolidated Consent
Warehouse 1 CEMP Appendix B - Condition Table
15-08-22 - Approval of CEMP
15-08-22 - Approval of CEMP
15-08-22 - Approval of CEMP
Appendix D - Confirmation no further consultation
Cond. E3i - Appendix F
SSD-10448-PA-40 - Approval Letter
15-08-22 - Approval of CEMP
15-08-22 - Approval of CEMP
15-08-22 - Approval of CEMP
15-08-22 - Approval of CEMP
SSD-10448 - Salinity Management Plan
15-08-22 - Approval of CEMP
610.19127-R03-v1.4-20221125
Appendix A - Building Staging Plan
SSD-10448 - Erosion and Sediment Control Plan
SSD-10448 - CNVMP
SSD-10448 - CAQMP
SSD-10448 - Vegetation Management Plan
SSD-10448 - Unexpected Finds Protocol
SSD-10448 - Waste Management Plan
Community Consultation Strategy
SSD10448 - CEMP (Stage 1)
01-08-22 - Approval of Staging Plan
05-08-22 - AIE CTMP
SSD-10448-PA-42- Approval of Plan
Appendix C - Angency Landowner and Utility Correspondence
Approval of Plan Strategy or Study (1)
Approval of Plan Strategy or Study CNVMP
Approval of Plan Strategy or Study Contam UFP
Approval of Plan Strategy or Study WMP
Appendix B - Utilities Staging Plan
Approval of Plan Strategy or Study SWMP
Cond. E3b & D25 - Appendix JA
Approval of Plan Strategy or Study SMP
Cond. E3d & D44 - Appendix
Approval of Plan Strategy or Study CAQMP
Approval of Plan Strategy or Study VMP
Cond. E3g & D77 - Appendix Q
Cond. E3h & D75 - Appendix M
Approval of Plan Strategy or Study
Appendix B - Utilities Staging Plan
Cond. E3 - Appendix J
Cond. E3c & D33 - Appendix K
Cond. E3e & D56 - Appendix H
Cond. E3f & D69 - Appendix N
23-02-16 - AIE Stage 1 Development CEMP - v1.3
230123 - Updated MOD 2 CEMP

Reports (5)

Stamped Plans SWC02 Stage 1B - Page 41-56
Stamped Plans SWC02 Stage 1B - Page 16-40
Stamped Plans SWC02 Stage 1B - Page 1-15
D61 - Interim Aboriginal Salvaging Report
Approval of Plan Strategy or Study_SSD-10448-PA-70

Notifications (3)

C7a Notification of Commencement of Construction - 12012023
Environmental Representative Statement re CEMP
Registeration of Aboriginal Sites

Other Documents (15)

Aspect - PA-36 - Approval Siigned
CNVIS Applicant Clarification
CNVIS
BCF372 - Section 6.33 Certificate - signed
Letter - Mirvac on BG September 22
Subdivision Works Certificate EA22 0045
Appointment of Experts_07062022_113657
Appointment of Experts
SSD10448 - Condition C31 - ER Appointment
23-01-25 - Condition D11 Approval
Appointment of Alternate ER
Extension of Out of Hours Works Approval
Extension Requests
221210 - Letter to DPIE re D10 and D11 Condition
AIE - PA-38 - Condition D7 Extension - Email

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

2/11/2022

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 1 - 20 of 20 submissions
Environment Protection Authority
Comment
,
Message
No Comment
Attachments
Crown Lands
Comment
,
Message
DPIE Crown Lands has no comments
Central (Western), Place & Infrastructure Greater Sydney, DPIE
Comment
Parramatta , New South Wales
Message
Attachments
WaterNSW
Comment
PARRAMATTA , New South Wales
Message
Please find attached WaterNSW's no comment response
Attachments
DPI Fisheries
Comment
ORANGE , New South Wales
Message
Please see attachment.
Attachments
DPI Agriculture
Comment
ORANGE , New South Wales
Message
See attached letter
Attachments
Name Withheld
Comment
KEMPS CREEK , New South Wales
Message
The imported fill should be sourced from within the Mamre Road Precinct, this is inline with the Draft DCP currently on exhibition and it prevents the mistakes of Jordan Springs. The developer should be limited to re-using excess spoil from other developers within the precinct, only.
Altis Property Partners
Comment
Sydney , New South Wales
Message
Altis supports employment within the Mamre Road Precinct, however recommend that DPIE consider the proponent extending their estate road to connect with neighboring sites. This will allow the roll our of orderly development and achieve the governments objectives of business investment and employment within Western Sydney
Attachments
The GPT Group
Object
SYDNEY , New South Wales
Message
GPT Pty Ltd as Trustee for the Kemps Creek Trust is the owner of 754-770 and 784-786 Mamre Road (Lot 59 and Lot 60 in DP259135). GPT is preparing an EIS for SSD-10272349.

GPT supports Mirvac’s SSD providing investment and jobs for the precinct and Western Sydney. Whilst Mirvac, GPT and other adjoining land owners have been engaging collaboratively, this letter intends to outline key items that relate to GPT’s ability to deliver its development and provide key access for our tenants.

This submission is in response to SSD-10448 which includes estate roads, Mamre Road intersection works, realignment of the existing creek, bulk earthworks and the construction and operation of Mirvac’s Warehouse 1 and Warehouse 3. GPT’s Mamre Road Site adjoins the Northern and Eastern Boundary and is therefore a key stakeholder of SSD-10448.

GPT have reviewed the exhibited documents of SSD Application and the Mamre Road Precinct Draft Development Control Plan (November 2020). GPT objects to the proposed Staging of the Access Roads and elements of the E2 for the following reasons.

The proposed staging of the access road does not provide for a safe and efficient road network.

SSDA-10448 provides for a signalised intersection in line with the Mamre Road Precinct Road Network Map (Figure 14 of the Mamre Road Precinct Draft Development Control Plan). This signalised intersection will be key to providing safe and efficient access to the Lots along Mamre Road including Lot 59 and 60 in DP259135.

Access Road 1 as depicted in SSDA-10448 represents a High Order Road that forms part of the Mamre Road Precinct Road Network. SSDA-10448 only allows for the construction of a portion of Access Road 1 with a temporary culd-de-sac restricting access to adjoining properties and the continuation of the Precinct Road Network.

If access to Lots 59 and 60 cannot be provided via the signalised intersection and connecting Road Network, access to these lots will be via Mamre Road. This proposal does not align with key stakeholders including DIPE and Penrith City Council’s objective. The objective is clear and is noted within key documents such as:
• Draft Mamre Road Precinct DCP, Control 2, (clause 3.2.1) “provide access to adjoining properties and not limit development on adjoining properties, including demonstration of impact on the development of adjoining lot”.
• SSD-10448, SEARs - The DPIE in the key issues section of the SEARs requires the application to include “detailing how the proposed development connects to adjoining sites to facilitate their future development for their intended purposes”

The road corridor provide critical infrastructure for the precinct. The partial construction of Access Road 1 impedes access to the required services and infrastructure for adjoining properties.

GPT request that Access Road 1 is extended to the Eastern Boundary as highlighted in Red in Figure 1. GPT will also comply by extending the access road to its northern boundary as part of SSD-10272349.

It is also requested that Access Road 1 is completed to the Eastern Boundary prior to the construction of Warehouse 1 and 3 to ensure the Mamre Road Precinct Road Network can be delivered in a timely manner.


Figure 1: Estate Works Staging Plan, SBA Architects, Accessed 14 December 2020, https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-10448%2120201110T054640.275%20GMT. GPT Amendment in Red.


Figure 2: Mamre Road Precinct Road Network Map, Mamre Road Precinct Draft Development Control Plan (November 2020).

The proposed E2 does not allow for required setbacks included Mamre Road Precinct Draft Development Control Plan.

SSD-10448 realigns the E2 corridor to the Northern Boundary of the site. GPT have been working collaboratively with Mirvac on the holistic realignment of the E2 to allow for ecological connectivity between South and Ropes Creek whilst allowing for an efficient masterplan for both land owners.

The current proposed realignment of the E2 in SSD-10448 does not allow for any landscape setbacks within the property boundaries. The proposed realignment would burden GPT as the adjoining land owner with additional landscape setbacks leading to a loss of developable land.

GPT request that the E2 corridor is realigned to a position that allows for any future landscape setbacks in the Final Mamre Road Precinct Development Control Plan so that the realignment does not disadvantage adjoining properties.

GPT would be willing to meet with the DPIE to discuss the above matters further.
Attachments
Western Sydney Airport
Comment
Liverpool , New South Wales
Message
Attachments
Roads and Maritime Services Division
Comment
PARRAMATTA , New South Wales
Message
Please find attached TfNSW comments
Attachments
Department of Transport
Comment
Chippendale , New South Wales
Message
TfNSW Response
Attachments
Biodiversity and Conservation Division
Comment
PARRAMATTA , New South Wales
Message
Please find attached EES response
Attachments
Penrith City Council
Comment
,
Message
Penrith Council comments uploaded for DPIE consideration in assessment.
Attachments
Heritage NSW – Aboriginal cultural heritage (ACH)
Comment
Sydney , New South Wales
Message
HNSW ACH advice attached.
Attachments
Sydney Water
Comment
Parramatta , New South Wales
Message
Attachments
NSW Rural Fire Service
Comment
Sydney Olympic Park , New South Wales
Message
Attachments
Water DPIE & NRAR
Comment
,
Message
Attached.
Attachments
Fire and Rescue NSW
Comment
,
Message
Please find attached.
Attachments

Pagination

Project Details

Application Number
SSD-10448
Assessment Type
State Significant Development
Development Type
Warehouse or distribution centres
Local Government Areas
Penrith
Decision
Approved
Determination Date
Decider
Director
Last Modified By
SSD-10448-Mod-2
Last Modified On
30/11/2022

Contact Planner

Name
David Schwebel